Recency-weighted scoring
Signals degrade by age. Fast-changing feeds (queues, charging ports, load announcements) now carry freshness weighting and confidence flags.
Lettuce Energy fuses grid capacity, permitting velocity, renewable resource, compute pipeline demand, and EV corridor signals into a single location strategy workflow for every U.S. market.
Layer-by-layer intelligence for grid, compute, and mobility. Analyze substations, transmission, datacenter hubs, and major EV charging networks in one map.
We moved from static state scoring to scenario-ready location strategy: compute hubs, charging access, polygon analysis, and reproducible exports.
Signals degrade by age. Fast-changing feeds (queues, charging ports, load announcements) now carry freshness weighting and confidence flags.
Datacenter projects are grouped into MW hubs so users can target regions where grid upgrades and hyperscale demand are already converging.
Tesla, Electrify America, EVgo, ChargePoint, and peers are now discoverable as clustered map layers for corridor and co-location analysis.
Draw a polygon, aggregate exposure metrics, then export a shareable SVG snapshot for internal IC memos, utility calls, and permitting prep.
Move from screening to siting with one system: shortlist regions, quantify constraints, export evidence, and move into utility and permitting conversations faster.
Use scenarios and layers to identify markets where transmission, substations, demand growth, and charging corridors align with your thesis.
Draw a boundary and return counts, MW exposure, and confidence metadata for substations, data centers, compute hubs, retiring plants, parcels, and EV charging.
Export snapshots and share links for IC review, utility outreach, and permit prep so location decisions remain reproducible across teams.
We use the Atlas as our own siting engine — every project we develop scores in the top decile of its category.
Interconnection-ready sites in ERCOT, CAISO, MISO, and SPP — screened by queue times, curtailment risk, and PPA pricing.
Direct clean-power delivery for AI datacenters and industrial C&I. On-site generation, storage, and V2G-ready microgrids sized to your load curve.
Community solar, virtual power plants, and DC-fast charging in markets where the policy and the load agree. Structured to share upside with residents.
Every number in the Atlas traces back to a public source. If it isn't citable, it isn't in the scoring.
Tell us the shape of the load or the shape of the site. We'll come back with what the data says — usually within 48 hours.